Eike 3 Richel – Germany

Eike 3 Richel – Germany

Assembly of technical area 1440m2 Assembly of greenhouse 29424m2 Irrigation system Electrical installation Sandwich panels installation on 500m2

United Kingdom – Bosman Van Zaal

United Kingdom – Bosman Van Zaal

Technical area 1.843 m2 -Erecting steel structure with vent system -Cladding roof with single layer poly film -Cladding gables/sides 123.2 m with sandwich panels, zipper system and single layer poly film -Rain water discharge + Condensation water discharge -3 doors Production area 23.654 m2 -Erecting steel structure with vent system -Cladding roof with single layer […]

Desert Joy Kas 9

Desert Joy Kas 9

GREENHOUSE ASSEMBLY Greenhouse (102.720 m²), corridor (3.835 m²), cantine (1.080 m²) = 107,635 m2 Screen system CO2 installation Electrical, automation and computer installation Packing Hall/Technical Room (13.840 m²) Water installation Fog system Heating system Cooling pad corridor