• English
  • Српски језик
  • Deutsch
  • Español

Desert Joy Kas 9

Project Info

Description

  • GREENHOUSE ASSEMBLY Greenhouse (102.720 m²),
  • corridor (3.835 m²), cantine (1.080 m²) = 107,635 m2
  • Screen system
  • CO2 installation
  • Electrical, automation and computer installation
  • Packing Hall/Technical Room (13.840 m²)
  • Water installation
  • Fog system
  • Heating system
  • Cooling pad corridor

Gallery