PTRE/Grow gutters, plastic for soil/ground cover, boiler room, heat storage tank, transport line, heating installation, CO2 installation, painting pipes, single screen installation, air recilculators, irrigation system, electricity, foundation with protective plot, building structure, external corridors, cladding roof and sides, rain water discharge, crop support, doors, Technical hall (7000m2)